Monday, October 11, 2010

Making Progress

Making some progress on my spin project.
So Stink'n cute!

Wednesday, October 6, 2010

Projects in the Works

I have been working on "Quilts With A Spin in 2010"
It has taken me a while to get the hang of it.
I am on block 3 of 9.
Another project, a quilt for my bedroom. I am making it up as I go.
 Not always a good idea.

Monday, September 6, 2010

Sister's Visit

Donna and Max
Sister Donna came to Mesa to help peel and pit dates for the Date Candy we make.
Max helped us find some great dates.

We also worked on a picture project.
We both know just enough about the computer to be dangerous
What we didn't do any of was Quilt!
Donna did bring this quilt she had been working on and Peg and I had to have a picture


Borders and Binding

Sunday, July 4, 2010

Projects in June and July

New Project!
My friend Donna made some dolls for her Granddaughters and they were so so cute.
I ordered the pattern and just found tea-dyed muslin and started the project.
I am real good at starting projects, I just need to finish them.

I did get some hexagons finished while traveling
Nine so far...

Sunday, May 30, 2010

Projects for May

GREAT THE DAY
WITH A SONG
~~
MAKE OTHERS HAPPY
~~
SERVE GLADY


Great words to live by.
After 50+ years I finally framed this project I made when I was 10 or 11.
Why did I pick those colors?

The granddaughters wanted to make hair bows for the new babies in the family.
This is the cute "big"baby Alli.

working on the bows

Sister Peg taught us how to make this Craft Apron

Redwork I have been working on for a long time ready to frame.

Tate's Graduation Quillow!!!

Tuesday, May 11, 2010

Cute Idea

Two of my daughters had babies this past Saturday and I have spent a lot of time in and out of the Hospital. This is what you pass on the way to both of the girls rooms.
These cute 12 inch quilt blocks quilted, bound and then framed.

Thursday, April 29, 2010

"A Few Of My Favorite Things" finished

I started this Redwork in 2005.
It was a BOM from Bobby Sock Quilt Co.
I loved the designs and these are really
"Most of My Favorite Things"
I took it with me everywhere I went. I stitched on Vacations, Dr. Offices, Watching
Grand kids sports, Sunday night when the kids come to visit.
I finally finished all 12 blocks and then the job of setting the quilt.
I didn't want to do the traditional shape and I had to find a block that would be the size of the Redwork.

I had some red triangles left from another project and I made it work for the border.
I had Kit machine quilt it.
I have 5 words for this quilt.
Love, Love, Love, Love it!!!!!

Binding on Three Quilts

This past week I finally bound three Quilts.
I do bind on the sewing machine but I wanted these done by Hand.
It does take a long time but it is so worth it on your favorite quilts

Friday, April 9, 2010

Baby Shower


I finished quilts for two new grandbabies.
Tried a pattern for a "Itty Bittly Baby Dress" sundress from:
"Made by Rae" Sooooo Cute and Soooo Fast.
Now I have to make a few more!
For Baby Jade
"Hunky Dory" fabric

For Baby Khloe
Pink and Black
The Mom's wanted "Minkee" on the back so I just made these quilts with strips and quilted "in the ditch" with a walking foot.

Friday, March 26, 2010

Road Trip

I Love a Road Trip!
My Husband likes to do all the driving and I always bring along a project or two to work on while traveling.Project bag.
We drove to California for our 43rd Anniversary.
It takes as much time to pack the project bag as the suitcase.

I had appliqued the Dresden Plates but I needed to applique the red centers.
Finished all 12 on the trip!


And two rows out of 16 to my "Mother-in-law" Project


I always get One token Quilt Store while traveling with my Husband.
This is the one I picked and it was a good pick (no pun intended)


And Just One Kit!
(my Idea, not husbands)

Wednesday, March 10, 2010

Quilts With a Spin

Start of a new Krazy Project I started.
From "Quilts with a Spin"
It's going to be Fabulous!

Wednesday, February 10, 2010

Just in Time For Valentines Day

I Have had a couple of Valentines Projects that I have been trying to finish.
A Table runner for the entry...
And this wall hanging for the Kitchen.
this has been ready to quilt for a whole year.
So good to have them finished



Monday, February 1, 2010

10 Jean's Quilts in 2010

This is how you start, rip the Jeans in 6-8 inch strips.

Lay strips out matching up the strip length to desired size.

Avoid matching seams.

Sew strips together and trim. It's ready to Quilt



Sunday, January 17, 2010

My Favorite Things

" My Favorite Things"quilt ready to be quilted

Friday, January 1, 2010

10 Quilts in 2010

10 Fabulous Quilts in 2010
Let's get started
Happy New Year!!!